The final stages of the “finishing work” of the Family Life Center are evident as we draw closer to building being completed.  Outside along the lanai and entrances, the tile is being completed and cleaned up.

Installation and "clean up" of the outside tile

Work on the FLC kitchen is moving along as the cupboards and hardware are now installed.

FLC kitchen cupboards and sink

FLC kitchen cupboards and sink

In the gymnasium, the dividing curtain is complete and ready for use.  The basketball hoops are now in place and have been raised to keep them out of the way for the completion of the floor.

Gymnasium dividing curtain

Gymnasium dividing curtain

In the gymasium, within the next two to three weeks, the Teraflex flooring will be installed.  When installed, it will mark a huge step towards the final completion of the Family Life Center.

Teraflex flooring waiting for installation

Teraflex flooring waiting for installation

On the second floor of the FLC, the final stages of the hand rails are complete.

FLC 2nd floor handrails

FLC second floor hand rails